Description:
Mechcon Welding and Fabrication was chosen to supply quality pipe fabrication for sites across W.A and Brisbane for several RADAR Transmit sites being built, which included full quality documentation and NDT carried out.
Overview:
Job: x2 off 300mm Dia Seamless Pipe Steel Headers
Client: Unified Services
Date Project Commenced: 15-04-2026
Duration of Scope: 1.5 Months
Specifications:
Welding: AS 4041-2006
Fabrication: Carbon Steel Piping
Materials: Mild Steel
Protective Coatings: Zinc Rich x1 Coat






