Mechcon Case Study - Department of Defence - BAE System - Chiller Pipe Header Fabrication

Australian Government – Department of Defence

Description:

Mechcon Welding and Fabrication was chosen to supply quality pipe fabrication for sites across W.A and Brisbane for several RADAR Transmit sites being built, which included full quality documentation and NDT carried out.

Overview:

Job: x2 off 300mm Dia Seamless Pipe Steel Headers

Client: Unified Services

Date Project Commenced: 15-04-2026

Duration of Scope: 1.5 Months

Specifications:
Welding: AS 4041-2006
Fabrication: Carbon Steel Piping
Materials: Mild Steel 
Protective Coatings: Zinc Rich x1 Coat

Like this article?

Share on Facebook
Share on Twitter
Share on Linkdin
Share on Pinterest
Share via Email
Share on WhatsApp

Have a project you would like to talk about?