CASE STUDY - BOSCH HEADQUARTERS CLAYTON

Job: Bosch Headquarters Clayton Metal Work and Stainless-Steel Balustrades

Description:

Mechcon Welding and Fabrication Pty Ltd was awarded the Metal Works package at the New Bosch Headquarters project Clayton in the second half of 2018.

The Scope covered a roof top garden Balustrade coated with a galvanised and powder coat paint finish, internally there was a x6 flight concrete stair requiring fabricated Handrails and Balustrades.

External concrete Wheelchair Ramp spanning over 70 Lineal metres of Marine grade 316 Stainless Steel fully compliant Handrail – Balustrade and adjacent were stairs also requiring Balustrade and Handrails.

Mechcon was required to following strict design detail relating to to AS1428.1-2009 all fabrication and installation passed inspection on completion by the Building surveyor.

Overview:

Job: Metal Work and Stainless Steel Handrails and Balustrades

Client:
BOSCH Headquaters Clayton

Date Project Commenced: June 2018

Duration of Scope: 4.5 Months

SPECIFICATION
Welding: AS1554
Fabrication: NCC2016 Volume 1, AS1428.1 2009 – Resists Loads to AS1170.1
Materials: 316 Stainless Steel and Grade 350 CHS
Protective Coatings: Hot Dip Galvanising – Powder Coating

Like this article?

Share on facebook
Share on Facebook
Share on twitter
Share on Twitter
Share on linkedin
Share on Linkdin
Share on pinterest
Share on Pinterest
Share on email
Share via Email
Share on whatsapp
Share on WhatsApp

Have a project you would like to talk about?