CASE STUDY - CITY OF WHITTLESEA CIVIC CENTRE HANDRAIL AND DISABLE ACCESS DDA UPGRADE

Job: x3 Separate Staircases and x2 Curved Ramps inside Civic Centre to be Installed

Description:

Advise Council on all specific DDA requirements prior to starting any works.

  • Removal and disposal of existing non-compliant Handrails
  • Floor Mounted DDA Compliant Stainless-Steel continuous Handrails throughout x2 Staircases inside Civic Centre Building Fully Welded and Polished high-end Architectural quality  (No modular allowed).
  • Wall Mounted DDA Compliant Custom Curved Stainless-Steel Handrails x2 Internal Ramps 33 Lineal Meters carefully rolled and polished 50mm S/Steel Tube
  • Wall Mounted DDA Compliant Stainless-Steel Handrails
  • Anti Slip Nosing to Stairs on Ground Level
  • Stainless Grit Tac Screw TGSI’s throughout all sections of Ground and first floor locations
  • Provide Council with documentation on DDA Compliance

Overview:

Job: x3 Separate Staircases and x2 Curved Ramps inside Civic Centre to be Installed

Client: City of Whittlesea Council

Date Project Commenced: April 2020

Duration of Scope: 6 Weeks

Like this article?

Share on facebook
Share on Facebook
Share on twitter
Share on Twitter
Share on linkedin
Share on Linkdin
Share on pinterest
Share on Pinterest
Share on email
Share via Email
Share on whatsapp
Share on WhatsApp

Have a project you would like to talk about?