Description:
Advise Council on all specific DDA requirements prior to starting any works.
- Removal and disposal of existing non-compliant Handrails
- Floor Mounted DDA Compliant Stainless-Steel continuous Handrails throughout x2 Staircases inside Civic Centre Building Fully Welded and Polished high-end Architectural quality (No modular allowed).
- Wall Mounted DDA Compliant Custom Curved Stainless-Steel Handrails x2 Internal Ramps 33 Lineal Meters carefully rolled and polished 50mm S/Steel Tube
- Wall Mounted DDA Compliant Stainless-Steel Handrails
- Anti Slip Nosing to Stairs on Ground Level
- Stainless Grit Tac Screw TGSI’s throughout all sections of Ground and first floor locations
- Provide Council with documentation on DDA Compliance
Overview:
Job: x3 Separate Staircases and x2 Curved Ramps inside Civic Centre to be Installed
Client: City of Whittlesea Council
Date Project Commenced: April 2020
Duration of Scope: 6 Weeks