Case Study - Springvale Level Crossing Removal Project
Railway Station Project- Metal Work Packages
Description:
Working with McConnell Dowell’s engineering department, Mechcon delivered structural steel fabrication solutions across various components throughout the entire 18-month project.
Items supplied and installed included: precision steel fabrication of PID/OCS hardware support frames (with full protective coatings), stormwater retention structures, steel canopies and shelters, a temporary bridge structure, handrails, and balustrades.