Case Study - Springvale Level Crossing Removal Project

Railway Station Project- Metal Work Packages

Description:

Working with McConnell Dowell’s engineering department, Mechcon delivered structural steel fabrication solutions across various components throughout the entire 18-month project.

Items supplied and installed included: precision steel fabrication of PID/OCS hardware support frames (with full protective coatings), stormwater retention structures, steel canopies and shelters, a temporary bridge structure, handrails, and balustrades.

Overview:

Job: Springvale Level Crossing Removal Project

Client: Vic Track – METRO

Date Project Commenced: March 2013

Duration of Scope: 18 Months