Description:
Working with Mc Connell Dowells engineering department for various fabricated items throughout entire 18-month project.
Items Supplied and Installed – Fabricated PID/OCS Hardware Support Frames requiring full protective coatings, Storm Water retention structures, Steel Canopy’s & Shelters including Temporary Bridge Structure, Handrails and Balustrades.
Overview:
Job: Springvale Level Crossing Removal Project
Client: Vic Track – METRO
Date Project Commenced: March 2013
Duration of Scope: 18 Months