CASE STUDY - SPRINGVALE LEVEL CROSSING REMOVAL PROJECT​

Railway Station Project- Metal Work Packages

Description:

Working with Mc Connell Dowells engineering department for various fabricated items throughout entire 18-month project.

Items Supplied and Installed – Fabricated PID/OCS Hardware Support Frames requiring full protective coatings, Storm Water retention structures, Steel Canopy’s & Shelters including Temporary Bridge Structure, Handrails and Balustrades.

Overview:

Job: Springvale Level Crossing Removal Project

Client: Vic Track – METRO

Date Project Commenced: March 2013

Duration of Scope: 18 Months