LAMB WESTON MARVEL PACKERS - STEEL FABRICATION, ROOF PLATFORMS, HANDRAILS AND BALUSTRADES MELBOURNE
Description:
The new acquisition of the Potato/Chip processing plant in Abbott Rd Hallam with Lamb Weston was firstly to provide enough investment to upgrade the plant to a standard that would facilitate the projected future growth. Critical to the increase in production was the development of the old services to achieve compliance to international standards.
The main area Lamb Weston was required to provide its initial investment was the improvement of the conditions within in the production line facility. This was achieved with the installation of new custom designed Heating and Cooling system which was housed on Mechcons Fabricated Steel Plant Platform . The new system was designed (CFM Air Conditioning) to control the temperature, humidity, and air pressure within the production facility and to ensure the air that all air being introduced to the facility was filtered to the required international standards required to achieve compliance certification.
Overview:
Mechcon Welding & Fabrication Designed Fabricated and Installed 120 SQM Hot Dipped Galvanised Plant Platform and Handrailing at the Hallam Food Processing Plant.
Overview:
Job: Steel Fabrication, Roof Platforms, Handrails and Balustrades
Client: Lamb Weston – Marvel Packers
Date Project Commenced: September, 2020
Duration of Scope: 4 Months