
HALLAM PRIMARY SCHOOL – VICTORIAN SCHOOL METAL WORK AND HANDRAILS AND BALUSTRADES
HALLAM PRIMARY SCHOOL – VICTORIAN SCHOOL METAL WORK AND HANDRAILS AND BALUSTRADES Victorian School Building Authority Description: Hallam Primary School
HALLAM PRIMARY SCHOOL – VICTORIAN SCHOOL METAL WORK AND HANDRAILS AND BALUSTRADES Victorian School Building Authority Description: Hallam Primary School
EDGARS CREEK PRIMARY SCHOOL – VICTORIAN SCHOOL METAL WORK AND HANDRAILS AND BALUSTRADES Victorian School Building Authority
CASE STUDY – KNOX CITY COUNCIL ARCHITECTURAL STAINLESS STEEL HANDRAIL Knox City Council
CASE STUDY – CONSTRUCTION OF 60,000 SQM STATE OF THE ART DISTRIBUTING WHAREHOUSE Mainfreight – Becon Constructions Description: Working with
CASE STUDY – CITY OF WHITTLESEA CIVIC CENTRE HANDRAIL AND DISABLE ACCESS DDA UPGRADE Job: x3 Separate Staircases and x2
CASE STUDY – CATHOLIC REGIONAL COLLEGE CAROLINE SPRINGS Job: Architectural Handrail, in Stainless Steel Marine Grade, Curved Powder Coated Handrail
CASE STUDY – DANDENONG CITY COUNCIL Job: Walker St Multi Level Car Park Balustrades Description: Mechcon was engaged by City
Mechcon was contracted to rectify and reinstate existing bridge handrails by Vic Roads and City of Melbourne which included Supply Fabrication and Installation of 350 Lineal Metres of Tubular Handrails.
CASE STUDY – BOSCH HEADQUARTERS CLAYTON Job: Bosch Headquarters Clayton Metal Work and Stainless-Steel Balustrades Description: Mechcon Welding and Fabrication
CASE STUDY – ARTS CENTRE MELBOURNE BALUSTRADE COMPLIANCE UPGRADE WORKS Job: Arts Centre Balustrade Compliance Upgrade Works Description: Mechcon Welding
© Mechcon Welding & Fabrication. All Rights Reserved | Website by OMiDESIGN