Case Study - One Steel, Slag Recycling Laverton

Job: One Steel Slag Recycling Laverton Steel Fabrication

Description:

Mechcon undertook a supply, fabricate and installation job for Multiserve & One Steel at their steel Mill in Laverton. Works were for a newly built recycling plant, that was going to use leftover Granulated Slag which would be crushed down via the new conveyor plant, and then to be used for road base and other construction purposes.

Magnet Drums, Large Chutes and Incline Belt Conveyor sections including Platforms/Walkways were some of the fabrication works involved.

Steel fabrication and Fitting were carried out and completed in our Keysborough workshop in 2007

Overview:

Job: Slag Recycling Plant

Client: Smorgan Steel

Date Project Commenced: March 2007

Duration of Scope: 5 Months

SPECIFICATION
Welding: AS1554   Fabrication: AS4041
Materials: Mild Steel 250-350 & Bisalloy 80
Protective Coatings: Sand Blast AS 1627.4 Class 2.5 Coating: Interprotect Epoxy Polyamide Primer